Follow this link to skip to the main content
  NASA Logo
Jet Propulsion Laboratory
California Institute of Technology
+ View the NASA Portal
Search JPL
JPL Home Earth Solar System Stars and Galaxies Technology
Mars Technology Program Website
Search MTP
 
Home Page
Mars Technology Program
Focused Technology Program
Mars Exploration Rover
Mars Reconnaissance Orbiter
Mars Science Laboratory
EDL Systems
Flight Software Systems
Long Life Systems
Payload Systems
Rover Technology
Second Decade Missions
Base Technology Program
Mars Science Instrument Development
Mars Science Instrument Development II
Mars Science Instrument Development III
Telecom and Navigation
Planetary Protection
Advanced EDL
Rover Technology
Subsurface Access
Low-Cost Mission Technologies
Advanced Electronics
News
participants
Gallery
Videos
Presentations
Publications
Contacts
User Admin - File Exchange
 
Image Gallery blank nav element blank nav element blank nav element
Base Technology > Mars Science Instrument Development > MIDP III

Mars Science Instrument Development - The main objective of MIDP (Mars Instrument Development Project) is to develop ground demonstrated miniature instruments that are at Technology Readiness Level (TRL) 3 into space qualifiable hardware (6); ready for response to Mars missions Announcement of Opportunity (AO).

Most of the existing instrument R&D programs (e.g., PIDDP) only support up to breadboard level (TRL 3, 4) and there is a need to carry such instruments to flight qualifiable status to respond to flight AO. Often the flight AO has only limited time and financial resources, and can not afford such hardware development processes. Thus the aim of the MIDP task is to bridge the existing gap between instrument R&D programs and hardware requirements for flight programs.

All the instruments being developed under MIDP have been selected through a highly competitive NRA process, and employ state-of-the-art technology. For example, 16 Instruments and 11 Instruments have been selected in FY 2002 and 2003 respectively (ROSS 2002 and 2003). Working with PIs, JPL has been managing the MIDP tasks since September 1998. When matured, the MIDP instruments will significantly enhance Mars Exploration capability.

Depending on instrument maturity, Mars Technology Program will arrange integration of instruments with an available rover (K9 Rover, FIDO, Rocky 7 or Rocky 8) and test in a Simulated Environment.

Point of Contact: Sam Kim

Image Gallery
A Miniature Submillimeter Spectrometer for Water
A Miniature Submillimeter Spectrometer for Water
A Rugged Miniature Mass-Spectrometer
A Rugged Miniature Mass-Spectrometer
Atmospheric Electron X-ray Spectrometer (AEXS): Flight Prototype Instrument for in-situ Elemental Analysis of Martian Surface Materials
Atmospheric Electron X-ray Spectrometer (AEXS): Flight Prototype Instrument for in-situ Elemental Analysis of Martian Surface Materials
Automated Drilling for Subsurface Sample Acquisition
Automated Drilling for Subsurface Sample Acquisition
Autonomous Meteorology Station
Autonomous Meteorology Station
Drill Integrated Neutron Spectrometer
Drill Integrated Neutron Spectrometer
HYDRA
HYDRA
Low Force Sample Acquisition System
Low Force Sample Acquisition System
Mars Borehole Spectrometer
Mars Borehole Spectrometer
Prototype Optical System for LIBS
Prototype Optical System for LIBS
Rover GPR for MSL
Rover GPR for MSL

NASA Privacy Statement Glossary Sitemap Feedback
USA GOV website - Your first click to the U.S. Government.   NASA Home Page